Infrastructure Validation Report
What's on this page
- Documentation for this infrastructure topic.
What this enables
- Operators can deploy and operate Inkorporated systems confidently.
Project: Inkorporated Homelab Infrastructure
Report Details
- Validation Date: [TO BE FILLED]
- Prepared By: [TO BE FILLED]
- Review Status: [TO BE FILLED] - [TO BE FILLED]
Executive Summary
This report validates the readiness of the physical infrastructure for the Inkorporated homelab deployment. All requirements outlined in the technical design document have been assessed and verified.
Physical Infrastructure Specifications
Proxmox Cluster Nodes
| Node Name |
CPU |
RAM |
Storage |
Network |
Status |
| [Node 1 Name] |
[CPU Spec] |
[RAM Amount] |
[Storage Type/Spec] |
[Network Interface] |
[Status] |
| [Node 2 Name] |
[CPU Spec] |
[RAM Amount] |
[Storage Type/Spec] |
[Network Interface] |
[Status] |
| [Node 3 Name] |
[CPU Spec] |
[RAM Amount] |
[Storage Type/Spec] |
[Network Interface] |
[Status] |
| [Node 4 Name] |
[CPU Spec] |
[RAM Amount] |
[Storage Type/Spec] |
[Network Interface] |
[Status] |
Storage Infrastructure
| Storage Type |
Capacity |
Redundancy |
Status |
| Local Storage |
[Capacity] |
[Redundancy] |
[Status] |
| Synology NAS |
[Capacity] |
[Redundancy] |
[Status] |
Network Connectivity
Network Topology
Based on the multi-zone network architecture described in the technical design document, the following network segments have been verified:
| Zone |
Subnet |
Gateway |
Purpose |
| Headquarters |
10.0.1.0/24 |
10.0.1.1 |
Executive offices and admin staff |
| Sales |
10.0.2.0/24 |
10.0.2.1 |
Sales team workstations and CRM access |
| Engineering |
10.0.3.0/24 |
10.0.3.1 |
Development and testing environments |
| Finance |
10.0.4.0/24 |
10.0.4.1 |
Accounting and financial systems |
| Human Resources |
10.0.5.0/24 |
10.0.5.1 |
HR personnel and sensitive data storage |
| IT |
10.0.6.0/24 |
10.0.6.1 |
IT support and monitoring tools |
| Servers |
10.0.7.0/24 |
10.0.7.1 |
Internal servers (file shares, databases) |
| DMZ |
10.0.8.0/24 |
10.0.8.1 |
Public-facing services |
| Guest WiFi |
10.0.9.0/24 |
10.0.9.1 |
Visitor network |
| Remote Access |
10.0.10.0/24 |
10.0.10.1 |
VPN pool for remote workers |
| inkternal |
10.0.11.0/24 |
10.0.11.1 |
Employee devices |
| inklab |
10.0.12.0/24 |
10.0.12.1 |
Internal-facing services |
| publink |
10.0.13.0/24 |
10.0.13.1 |
Production services for external access |
Connectivity Verification
- [ ] All Proxmox nodes can communicate with each other
- [ ] Network connectivity between nodes is stable
- [ ] VLAN configuration is properly set up
- [ ] pfSense VM network interfaces are correctly configured
- [ ] External network access is properly configured
Power Redundancy
Power Supply Assessment
| Component |
Power Supply |
Redundancy |
Status |
| Proxmox Nodes |
[Power Supply] |
[Redundancy] |
[Status] |
| Synology NAS |
[Power Supply] |
[Redundancy] |
[Status] |
| Network Equipment |
[Power Supply] |
[Redundancy] |
[Status] |
| Backup Power |
[UPS/Generator] |
[Redundancy] |
[Status] |
Storage Availability
Storage Resources
| Resource |
Type |
Size |
Availability |
Status |
| Longhorn Storage |
Block Storage |
[Size] |
[Available] |
[Status] |
| NFS Storage |
Synology NAS |
[Size] |
[Available] |
[Status] |
| Backup Storage |
MinIO |
[Size] |
[Available] |
[Status] |
Validation Results
Hardware Readiness
- [ ] All physical servers meet minimum specifications
- [ ] Network infrastructure supports required topology
- [ ] Storage resources are available and properly configured
- [ ] Power redundancy meets requirements
Software Prerequisites
- [ ] Proxmox installation ready for VM provisioning
- [ ] Network configuration complete
- [ ] SSH access to all nodes established
- [ ] Required software packages installed
Risk Assessment
| Risk |
Likelihood |
Impact |
Mitigation |
| [Risk 1] |
[Likelihood] |
[Impact] |
[Mitigation] |
| [Risk 2] |
[Likelihood] |
[Impact] |
[Mitigation] |
Recommendation
Ready for Next Phase: [YES/NO] - [REASON]
Approval
- Prepared By: ____ Date: ___
- Reviewed By: ____ Date: ___
- Approved By: ____ Date: ___
Attachments
- Network topology diagram
- Hardware specifications document
- Network configuration files
- Power distribution diagram